Construction projects

Dordogne Viaduct

In-situ pouring of the bridge segment concrete in the Summer of 2012 for this part of the Tours-Bordeaux high-speed railway line construction project.

CHRYSO® products used: CHRYSO®Fluid Optima 100 & CHRYSO®Fluid Optima 380.

Project Details

  • Type of job site : Bridge
  • Place : France
  • Date : 2015-07-07
Scroll to Top