In the ancient city of Torun in northern Poland a new cable-stayed bridge spanning 530m over the Vistula River was built in 2013. Between May and August 2013 VSL Heavy Lifting moved 16 deck segments, each weighing 250t, from a pontoon onto the temporary hanger cables. Depending on the water level the lifting distance was about 15m. In a second operation the deck segments were precisely aligned and permanent fixed to the hanger cables.

CHRYSO® products used:

  • CHRYSO®Fluid Optima 175
  • CHRYSO®Air A
  • CHRYSO®Fibre Syntec 12

Project Details

  • Type of job site : Bridge
  • Place : Torun, Poland
  • Date : 2012-02-02